The process of creating an independent Ukrainian church removed from Russian influence has dominated recent news from eastern Europe.
The decision on December 15 to elect Metropolitan Epiphany, 39, as head of the new Ukrainian Orthodox Church is a momentous development.
It marks the last stage in a process establishing an independent church recognised by the leading figure in the Orthodox world and is the culmination of many years of hard work of religious leaders and politicians.
In the past 30 years, Ukraine has been through five presidents, open aggression from Russia and the break-up of the Soviet Union. The idea of an independent Ukrainian church persisted throughout these turbulent times and has become a reality this year.
The religious picture of Ukraine is complex. Since independence in 1991, there have been three churches competing for dominance.
The first is the Moscow Patriarchate, a Ukrainian church subordinate to the Russian Orthodox Church. It has the largest number of parishes in Ukraine.
Because of its connection with the Russian Orthodox Church, it was widely recognised by the other Orthodox Churches.
The smaller Kiev Patriarchate, from which the newly appointed Metropolitan Epiphany comes, and the Ukrainian Autocephalous Orthodox Church have operated without official recognition since the 1990s.
They have been the main instigators of a break with Russian influence and the establishment of an independent, unified church.
On October 11, Ecumenical Patriarch Bartholomew in Istanbul, regarded in the worldwide Orthodox Church as the “first among equals”, decided in principle to grant autocephaly, in effect recognition of independence, to the Ukrainians.
He then abolished what he considered to be a temporary measure dating from 1686. In that year, Dionysius IV, gave permission to the Patriarch of Moscow to ordain the Metropolitan of Kiev.
The Ecumenical Patriarchate decided that the 1686 decision had come to an end due to a number of breaches of its terms, including non-recognition of the overarching authority of the Ecumenical Patriarch and the failure of the Russian Orthodox Church over the past 30 years to address the split in Ukraine.
Given the silence of the Ecumenical Patriarchate on this issue for more than 300 years, the Russian Orthodox Church was taken by surprise.
In response, the Russian Orthodox Church decided to break all ties with the Patriarchate of Constantinople. The result has been a huge split in the Orthodox world and a huge blow to its unity.
There are about 150 million followers of the Russian Orthodox Church out of 300 million Orthodox adherents worldwide.
Its biggest effect will probably be felt in diaspora communities such as that in the US, where those baptised in the Russian Orthodox Church will not be able to take part of services or sacraments at a church that is under the jurisdiction of the Ecumenical Patriarchate.
The annulment of the 1686 decision allowed the territory of Ukraine to be returned to the jurisdiction of the Ecumenical Patriarch in Constantinople, until the head of the new Orthodox Church in Ukraine receives the formal decree of independence, expected to take place on January 6.
The idea for an independent Ukrainian church first emerged in 1921 during the short-lived Ukrainian National Republic but the idea did not gain momentum until after Ukraine became independent in 1991.
In the first years of Ukraine’s independence, its ecclesiastical life was turbulent with frequent changes in the church structures.
They included the Russian Orthodox Church charging Metropolitan Filaret with leading the Moscow Patriarchate into schism in 1992, a failed church unification attempt the same year and the appointment of Filaret as a head of the Kiev Patriarchate in 1995.
As early as 1993, Ukraine’s first president, Leonid Kravchuk, sent a representative to discuss the possibility of autocephaly with the Ecumenical Patriarch.
President Leonid Kuchma kept a more balanced approach towards the autocephaly question, while president Viktor Yushchenko worked hard for autocephaly and unification of all the Ukrainian churches, but with little result.
The war with Russia in Ukraine’s east and the annexation of Crimea in 2014 revived the religious battle over autocephaly. The Moscow Patriarchate has often been portrayed as a mouthpiece for Russian President Vladimir Putin.
It has been criticised by the Ukrainian administration for its role in the war, with claims that it has sided with pro-Russian forces.
President Petro Poroshenko has often described Russian interference in Ukraine’s religious life as a matter of hybrid warfare and portrayed the push for church independence as a national security question.
The Euromaidan protests at the end of 2013 and beginning of 2014, and the ensuing annexation of Crimea, provided a valuable boost to Mr Poroshenko’s bid for church independence.
The protests, which were triggered by the failure to sign the Association Agreement with the EU, resulted in more than 100 deaths, with many more injured.
Mr Yanukovich fled the country in February 2014 and Mr Poroshenko won the following elections in the first round with his pro-EU stance and the promise to reclaim Crimea and the eastern parts of Ukraine.
During his presidency, Mr Poroshenko used the entire state machinery to persuade the Ecumenical Patriarch of Constantinople to grant autocephaly.
Next year will be a test for the independent Orthodox Church in Ukraine. Uncertainty looms over the future of the Moscow Patriarchate, which does not recognise the newly founded church and considers itself to be the only legitimate Orthodox church in Ukraine.
Next year will be an election year in Ukraine, which means that we might again witness the involvement of politics in Ukraine’s religious life.
Andreja Bogdanovski is a PhD researcher at the University of Buckingham in the UK, where he studies church politics in the Eastern Orthodox Church
Mercer, the investment consulting arm of US services company Marsh & McLennan, expects its wealth division to at least double its assets under management (AUM) in the Middle East as wealth in the region continues to grow despite economic headwinds, a company official said.
Mercer Wealth, which globally has $160 billion in AUM, plans to boost its AUM in the region to $2-$3bn in the next 2-3 years from the present $1bn, said Yasir AbuShaban, a Dubai-based principal with Mercer Wealth.
“Within the next two to three years, we are looking at reaching $2 to $3 billion as a conservative estimate and we do see an opportunity to do so,” said Mr AbuShaban.
Mercer does not directly make investments, but allocates clients’ money they have discretion to, to professional asset managers. They also provide advice to clients.
“We have buying power. We can negotiate on their (client’s) behalf with asset managers to provide them lower fees than they otherwise would have to get on their own,” he added.
Mercer Wealth’s clients include sovereign wealth funds, family offices, and insurance companies among others.
From its office in Dubai, Mercer also looks after Africa, India and Turkey, where they also see opportunity for growth.
Wealth creation in Middle East and Africa (MEA) grew 8.5 per cent to $8.1 trillion last year from $7.5tn in 2015, higher than last year’s global average of 6 per cent and the second-highest growth in a region after Asia-Pacific which grew 9.9 per cent, according to consultancy Boston Consulting Group (BCG). In the region, where wealth grew just 1.9 per cent in 2015 compared with 2014, a pickup in oil prices has helped in wealth generation.
BCG is forecasting MEA wealth will rise to $12tn by 2021, growing at an annual average of 8 per cent.
Drivers of wealth generation in the region will be split evenly between new wealth creation and growth of performance of existing assets, according to BCG.
Another general trend in the region is clients’ looking for a comprehensive approach to investing, according to Mr AbuShaban.
“Institutional investors or some of the families are seeing a slowdown in the available capital they have to invest and in that sense they are looking at optimizing the way they manage their portfolios and making sure they are not investing haphazardly and different parts of their investment are working together,” said Mr AbuShaban.
Some clients also have a higher appetite for risk, given the low interest-rate environment that does not provide enough yield for some institutional investors. These clients are keen to invest in illiquid assets, such as private equity and infrastructure.
“What we have seen is a desire for higher returns in what has been a low-return environment specifically in various fixed income or bonds,” he said.
“In this environment, we have seen a de facto increase in the risk that clients are taking in things like illiquid investments, private equity investments, infrastructure and private debt, those kind of investments were higher illiquidity results in incrementally higher returns.”
The Abu Dhabi Investment Authority, one of the largest sovereign wealth funds, said in its 2016 report that has gradually increased its exposure in direct private equity and private credit transactions, mainly in Asian markets and especially in China and India. The authority’s private equity department focused on structured equities owing to “their defensive characteristics.”
MATCH INFO
Uefa Champions League final:
Who: Real Madrid v Liverpool
Where: NSC Olimpiyskiy Stadium, Kiev, Ukraine
When: Saturday, May 26, 10.45pm (UAE)
TV: Match on BeIN Sports
The bio
Favourite book: The Alchemist by Paulo Coelho
Favourite travel destination: Maldives and south of France
Favourite pastime: Family and friends, meditation, discovering new cuisines
Favourite Movie: Joker (2019). I didn’t like it while I was watching it but then afterwards I loved it. I loved the psychology behind it.
Favourite Author: My father for sure
Favourite Artist: Damien Hurst
Test
Director: S Sashikanth
Cast: Nayanthara, Siddharth, Meera Jasmine, R Madhavan
Star rating: 2/5
Volvo ES90 Specs
Engine: Electric single motor (96kW), twin motor (106kW) and twin motor performance (106kW)
Power: 333hp, 449hp, 680hp
Torque: 480Nm, 670Nm, 870Nm
On sale: Later in 2025 or early 2026, depending on region
Price: Exact regional pricing TBA
Election pledges on migration
CDU: "Now is the time to control the German borders and enforce strict border rejections"
SPD: "Border closures and blanket rejections at internal borders contradict the spirit of a common area of freedom"
The story in numbers
18
This is how many recognised sects Lebanon is home to, along with about four million citizens
450,000
More than this many Palestinian refugees are registered with UNRWA in Lebanon, with about 45 per cent of them living in the country’s 12 refugee camps
1.5 million
There are just under 1 million Syrian refugees registered with the UN, although the government puts the figure upwards of 1.5m
73
The percentage of stateless people in Lebanon, who are not of Palestinian origin, born to a Lebanese mother, according to a 2012-2013 study by human rights organisation Frontiers Ruwad Association
18,000
The number of marriages recorded between Lebanese women and foreigners between the years 1995 and 2008, according to a 2009 study backed by the UN Development Programme
77,400
The number of people believed to be affected by the current nationality law, according to the 2009 UN study
4,926
This is how many Lebanese-Palestinian households there were in Lebanon in 2016, according to a census by the Lebanese-Palestinian dialogue committee
The Pope's itinerary
Sunday, February 3, 2019 - Rome to Abu Dhabi
1pm: departure by plane from Rome / Fiumicino to Abu Dhabi
10pm: arrival at Abu Dhabi Presidential Airport
Monday, February 4
12pm: welcome ceremony at the main entrance of the Presidential Palace
12.20pm: visit Abu Dhabi Crown Prince at Presidential Palace
5pm: private meeting with Muslim Council of Elders at Sheikh Zayed Grand Mosque
6.10pm: Inter-religious in the Founder's Memorial
Tuesday, February 5 - Abu Dhabi to Rome
9.15am: private visit to undisclosed cathedral
10.30am: public mass at Zayed Sports City – with a homily by Pope Francis
12.40pm: farewell at Abu Dhabi Presidential Airport
1pm: departure by plane to Rome
5pm: arrival at the Rome / Ciampino International Airport
The specs
Engine: 1.5-litre turbo
Power: 181hp
Torque: 230Nm
Transmission: 6-speed automatic
Starting price: Dh79,000
On sale: Now
TV (UAE time);
OSN Sports: from 10am
The smuggler
Eldarir had arrived at JFK in January 2020 with three suitcases, containing goods he valued at $300, when he was directed to a search area.
Officers found 41 gold artefacts among the bags, including amulets from a funerary set which prepared the deceased for the afterlife.
Also found was a cartouche of a Ptolemaic king on a relief that was originally part of a royal building or temple.
The largest single group of items found in Eldarir’s cases were 400 shabtis, or figurines.
Khouli conviction
Khouli smuggled items into the US by making false declarations to customs about the country of origin and value of the items.
According to Immigration and Customs Enforcement, he provided “false provenances which stated that [two] Egyptian antiquities were part of a collection assembled by Khouli's father in Israel in the 1960s” when in fact “Khouli acquired the Egyptian antiquities from other dealers”.
He was sentenced to one year of probation, six months of home confinement and 200 hours of community service in 2012 after admitting buying and smuggling Egyptian antiquities, including coffins, funerary boats and limestone figures.
For sale
A number of other items said to come from the collection of Ezeldeen Taha Eldarir are currently or recently for sale.
Their provenance is described in near identical terms as the British Museum shabti: bought from Salahaddin Sirmali, "authenticated and appraised" by Hossen Rashed, then imported to the US in 1948.
- An Egyptian Mummy mask dating from 700BC-30BC, is on offer for £11,807 ($15,275) online by a seller in Mexico
- A coffin lid dating back to 664BC-332BC was offered for sale by a Colorado-based art dealer, with a starting price of $65,000
- A shabti that was on sale through a Chicago-based coin dealer, dating from 1567BC-1085BC, is up for $1,950
Emergency
Director: Kangana Ranaut
Stars: Kangana Ranaut, Anupam Kher, Shreyas Talpade, Milind Soman, Mahima Chaudhry
Rating: 2/5
Profile of Tamatem
Date started: March 2013
Founder: Hussam Hammo
Based: Amman, Jordan
Employees: 55
Funding: $6m
Funders: Wamda Capital, Modern Electronics (part of Al Falaisah Group) and North Base Media
On racial profiling at airports
The specs
Engine: 3.0-litre flat-six twin-turbocharged
Transmission: eight-speed PDK automatic
Power: 445bhp
Torque: 530Nm
Price: Dh474,600
On Sale: Now
Dubai works towards better air quality by 2021
Dubai is on a mission to record good air quality for 90 per cent of the year – up from 86 per cent annually today – by 2021.
The municipality plans to have seven mobile air-monitoring stations by 2020 to capture more accurate data in hourly and daily trends of pollution.
These will be on the Palm Jumeirah, Al Qusais, Muhaisnah, Rashidiyah, Al Wasl, Al Quoz and Dubai Investment Park.
“It will allow real-time responding for emergency cases,” said Khaldoon Al Daraji, first environment safety officer at the municipality.
“We’re in a good position except for the cases that are out of our hands, such as sandstorms.
“Sandstorms are our main concern because the UAE is just a receiver.
“The hotspots are Iran, Saudi Arabia and southern Iraq, but we’re working hard with the region to reduce the cycle of sandstorm generation.”
Mr Al Daraji said monitoring as it stood covered 47 per cent of Dubai.
There are 12 fixed stations in the emirate, but Dubai also receives information from monitors belonging to other entities.
“There are 25 stations in total,” Mr Al Daraji said.
“We added new technology and equipment used for the first time for the detection of heavy metals.
“A hundred parameters can be detected but we want to expand it to make sure that the data captured can allow a baseline study in some areas to ensure they are well positioned.”
Specs
Engine: 51.5kW electric motor
Range: 400km
Power: 134bhp
Torque: 175Nm
Price: From Dh98,800
Available: Now
More from our neighbourhood series:
Formula Middle East Calendar (Formula Regional and Formula 4)
Round 1: January 17-19, Yas Marina Circuit – Abu Dhabi
Round 2: January 22-23, Yas Marina Circuit – Abu Dhabi
Round 3: February 7-9, Dubai Autodrome – Dubai
Round 4: February 14-16, Yas Marina Circuit – Abu Dhabi
Round 5: February 25-27, Jeddah Corniche Circuit – Saudi Arabia
The White Lotus: Season three
Creator: Mike White
Starring: Walton Goggins, Jason Isaacs, Natasha Rothwell
Rating: 4.5/5
The National's picks
4.35pm: Tilal Al Khalediah
5.10pm: Continous
5.45pm: Raging Torrent
6.20pm: West Acre
7pm: Flood Zone
7.40pm: Straight No Chaser
8.15pm: Romantic Warrior
8.50pm: Calandogan
9.30pm: Forever Young