Emaar Properties has announced the completion of advanced wind tunnel tests on The Tower at Dubai Creek Harbour. Courtesy Emaar Properties
Emaar Properties has announced the completion of advanced wind tunnel tests on The Tower at Dubai Creek Harbour. Courtesy Emaar Properties

The Tower at Dubai Creek Harbour: Wind tests completed on UAE’s future tallest building



Anyone who has stood atop a skyscraper, be it New York’s Empire State Building or Dubai’s Burj Khalifa, can attest to the power of nature at such heights.

Not only is the wind strong, it also behaves in complex ways when coming into contact with tall buildings, meaning there is more to building megastructures than just the aesthetic.

With this in mind, Emaar Properties, the Dubai developer, has confirmed that it has completed advanced wind tunnel tests on The Tower at Dubai Creek Harbour, which is set to be 100 metres taller than the 828-metre Burj Khalifa when complete.

Emaar said the wind tests were crucial in defining the final height and design aspects, while the project’s Spanish-Swiss architect Santiago Calatrava Valls added that they “were an important component in the structural design stage, and we have deployed innovative engineering techniques to confirm the strength of the new icon”.

The tests involved 12 different analysis and testing methods to ensure that all possible ­cases were considered, according to Emaar. They were carried out for the entirety of the project using a scale model. As part of climate tests in the local area, measurements were taken at different heights, including data provided by the weather stations.

__________________________

The Tower at Dubai Creek Harbour - watch the video here

Dubai Creek Harbour project - see it in pictures here

Dubai to add hotel with tropical rainforest and artificial beach in the sky

__________________________

Seismic studies were also done on the local ground conditions “to guarantee the maximum safety and stability of the building. The design of The Tower also includes multiple damper systems and shock absorption systems, located at different points and heights”, Emaar said.

Work on the project got under way last month, with Aurecon appointed as the engineer and architect on record and the Cala­trava team leading design and engineering works.

The Tower was described by the Emaar chairman Mohamed Alabbar as “an ambitious project on a never-before scale and design” which will require “high-precision engineering across all its facets”.

He said The Tower “will serve as a beacon of hope and positivity for the city and the region”.

The 6 square kilometre master-planned community was revealed in April, when Emaar said it would have 2km of creekside waterfront and would house 679 million sq metres of residential space, 851,000 sq metres of commercial property, 22 hotels with 4,400 rooms and 11.1 million sq metres of retail. By comparison, The Dubai Mall has an overall footprint of 1.1 million sq metres.

The Tower will feature a VIP observation garden deck, and glazed rotating balconies.

It is scheduled to be delivered ahead of Expo 2020 starting in October of that year, and is to cost US$1 billion to build.

ioxborrow@thenational.ae

Follow The National's Business section on Twitter

Formula Middle East Calendar (Formula Regional and Formula 4)
Round 1: January 17-19, Yas Marina Circuit – Abu Dhabi
 
Round 2: January 22-23, Yas Marina Circuit – Abu Dhabi
 
Round 3: February 7-9, Dubai Autodrome – Dubai
 
Round 4: February 14-16, Yas Marina Circuit – Abu Dhabi
 
Round 5: February 25-27, Jeddah Corniche Circuit – Saudi Arabia
Our family matters legal consultant

Name: Hassan Mohsen Elhais

Position: legal consultant with Al Rowaad Advocates and Legal Consultants.

The%20specs
%3Cp%3E%3Cstrong%3EEngine%3A%20%3C%2Fstrong%3E2.9-litre%20twin-turbo%20V6%0D%3Cbr%3E%3Cstrong%3ETransmission%3A%20%3C%2Fstrong%3E8-speed%20auto%0D%3Cbr%3E%3Cstrong%3EPower%3A%20%3C%2Fstrong%3E536hp%20(including%20138hp%20e-motor)%0D%3Cbr%3E%3Cstrong%3ETorque%3A%20%3C%2Fstrong%3E750Nm%20(including%20400Nm%20e-motor)%0D%3Cbr%3E%3Cstrong%3EPrice%3A%20%3C%2Fstrong%3EFrom%20Dh1%2C380%2C000%0D%3Cbr%3E%3Cstrong%3EOn%20sale%3A%20%3C%2Fstrong%3Enow%3C%2Fp%3E%0A
The specs

AT4 Ultimate, as tested

Engine: 6.2-litre V8

Power: 420hp

Torque: 623Nm

Transmission: 10-speed automatic

Price: From Dh330,800 (Elevation: Dh236,400; AT4: Dh286,800; Denali: Dh345,800)

On sale: Now

Specs

Engine: 51.5kW electric motor

Range: 400km

Power: 134bhp

Torque: 175Nm

Price: From Dh98,800

Available: Now

RedCrow Intelligence Company Profile

Started: 2016

Founders: Hussein Nasser Eddin, Laila Akel, Tayeb Akel 

Based: Ramallah, Palestine

Sector: Technology, Security

# of staff: 13

Investment: $745,000

Investors: Palestine’s Ibtikar Fund, Abu Dhabi’s Gothams and angel investors

Specs

Engine: Dual-motor all-wheel-drive electric

Range: Up to 610km

Power: 905hp

Torque: 985Nm

Price: From Dh439,000

Available: Now

NO OTHER LAND

Director: Basel Adra, Yuval Abraham, Rachel Szor, Hamdan Ballal

Stars: Basel Adra, Yuval Abraham

Rating: 3.5/5

Sri Lanka-India Test series schedule

 

  • 1st Test India won by 304 runs at Galle
  • 2nd Test Thursday-Monday at Colombo
  • 3rd Test August 12-16 at Pallekele